摘要
介绍了加快国家重点工程———云南小湾水电站地下厂房施工的施工顺序、施工通道、施工循环、施工方法、施工机械设备等重要技术措施。这些技术措施小湾水电站下阶段优化设计施工以及其它地下工程施工都有重要的指导意义和参考价值。
This paper describes important technical measures to accelerate construction of the state key preject, Yunnan Xiaowan hydroplants underground plant buildings, such as construction procedure, construction passage, construction cycle, construction method, construction machinary, construction calender and so on.These technical meaures had improtant instructive significance and refrence value for the next stage's optimum design and construction of Xiaowan hydroplant,and construction of other undergrand engineerings.
出处
《四川大学学报(工程科学版)》
EI
CAS
CSCD
2001年第1期23-26,共4页
Journal of Sichuan University (Engineering Science Edition)
基金
国家九五科技攻关项目! (96 2 2 1 0 5 0 5 0 3)
关键词
小湾水电站
云南
地下厂房
施工
技术措施
Xiaowan hydroplant
construction of underground plant buildings
technical measure