人工湿地不同填料组合去除典型污染物的研究 被引量:46

Removal efficiency of typical pollutants by different substrate combinations for constructed wetlands
原文传递
导出
摘要 选取沸石、火山岩、空心砖、钢渣4种填料,通过对水中典型污染物的等温吸附试验,进行填料组合方式的优化配比.选取优化后的配比组合模拟人工湿地基质系统进行动态试验,进一步考察分析不同填料组合对污染物去除效果的差异.实验结果表明,Langmuir模型能够较好地模拟填料对氮、磷的吸附过程.各填料对NH+4-N的饱和吸附量大小为沸石(2388.92 mg·kg-1)>空心砖(618.39 mg·kg-1)>火山岩(310.84mg·kg-1);对磷的饱和吸附量大小为空心砖(3051.57 mg·kg-1)>钢渣(2863.69 mg·kg-1)>火山岩(1102.78 mg·kg-1)>沸石(717.15mg·kg-1).在动态试验中,不同的填料组合对污染物具有不同的去除效果.综合考虑各填料组合对污染物的去除,选取效果最优的填料组合为ZH11(沸石与空心砖质量比1∶1混合),其对COD、NH+4-N、NO-3-N、TP的去除率分别达到62.40%、95.54%、59.82%和97.50%. Zeolite, volcanic rock, hollow brick debris and steel slag were selected as potential substrates in a constructed wetland. Firstly, the substrate combinations were optimized and combined according to adsorption isotherm tests. The combinations with satisfactory removal efficiencies were then investigated for dynamic tests of pollutant removal in simulated wetland substrate columns. The results showed that Langmuir equations were well fitted for describing the adsorption characteristics of all single substrates. The theoretical saturated adsorption capacity of ammonia nitrogen onto three substrates followed the order of zeolite (2388.92 mg kg-1) 〉 hollow brick (618.39 mg kg-1) 〉 volcanic rock (310.84 mg kg-1). The theoretical maximum adsorption capacities of phosphorous onto four substrates followed the order of hollow brick (3051.57 mg kg-1) 〉 steel slag (2863.69 mg kg-1) 〉 volcanic rock (1102.78 mg kg-1) 〉 zeolite (717.15 mg kg-1). In dynamic experiments, the pollutant removal efficiency varied with the substrate combinations. The substrate combination with the best removal efficiency was ZH11 (zeolite: hollow brick 1 :1). With ZH11, the removal rates of COD, NH4+-N, NO3--N and TP could achieve 62.40%, 95.54%, 59.82% and 97.50%, respectively.
出处 《环境科学学报》 CAS CSCD 北大核心 2014年第3期704-711,共8页 Acta Scientiae Circumstantiae
基金 国家水体污染控制与治理科技重大专项(No.2012ZX01004-003)~~
关键词 人工湿地 填料组合 沸石 钢渣 constructed wetland substrate combinations zeolite steel slag
  • 相关文献

参考文献18

  • 1Ahn Y H. 2006. Sustainable nitrogen elimination biotechnologies: a review[ J]. Process Biochemistry, 41 : 1709- 1721.
  • 2Andrea S B, Melissa N R, Larry D G,et a/.2000. Phosphorus removal by wollastonite: A constructed wetland substrate [ J ]. Ecological Engineering, 15(1/2) : 121-132.
  • 3Bezbaruah A N ,Zhang T C. 2003. Performance of a constructed wetland with a sulfur/limestone denitrification section for wastewater nitrogen removal [ J ]. Environmental Science and Technology, 37 ( 8 ) : 1690-1697.
  • 4Bowden L I, Jarvis A P, Younger P L, et al. 2009. Phosphorus removal from wastewaters using basic oxygen steel slag [ J ]. EnvironmentalScience and Technology, 43 (7) : 2476- 2481.
  • 5Cristian B, Claire G, Daniel M, et a/.2012. Phosphate removal from synthetic and real wastewater using steel slags produced in Europe [ J]. Water Research, 46(7) :2376- 2384.
  • 6Drizo A, Frost C A, Grace J, et al. 2000. phosphate and ammonium distribution in a pilot-scale constructed wetland with horizontal subsurface flow using shale as a substrate [ J . Water Research, 34 (9) :2483-2490.
  • 7Drizo A, Frost C A, Smith K A, et al. 1997. Phosphate and ammonium removal by constructed wetlands with horizontal subsurface flow, using shale as a substrate[ J]. Water Science Technology, 35 (5) : 95-102.
  • 8黄逸群,张民,徐玉新.人工湿地填料净化生活污水级配优化研究[J].环境科学与技术,2009,32(3):130-134. 被引量:26
  • 9Ong S A, Uchiyama K,Inadama D,et a/.2010. Performance evaluation of laboratory scale up-flow constructed wetlands with different designs and emergent plants [ J ]. Bioresource Technology, 101 ( 6 ) : 7239- 7244.
  • 10Prochaska C A, Zouboulis A I. 2006. Removal of phosphates by pilot vertical-flow constructed wetlands using a mixture of sand and dolomite as substrate[ J]. Ecological Engineer-ing, 26(3) :293-303.

二级参考文献162

共引文献456

同被引文献640

引证文献46

二级引证文献316

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部