向斜核部超深孔施工技术

Super Deep Borehole Operation on Syncline Core
下载PDF
导出
摘要 在河北省开平向斜核部煤田普查区,由于煤层埋藏较深,地层易缩径、压力异常,给钻探施工带来巨大压力。2011年2月19日,本区ZK9-1号钻孔成功完成地质钻探任务,实际终孔深度1950.68m,为国内目前该区采用Φ50mm钻杆施工煤田取心最深钻孔。从设备选择、钻具选择使用及其抗拉强度扭矩校核,泥浆使用、压力平衡钻进、防斜措施等方面介绍了该孔克服深孔地层压力异常、泥岩蠕变钻孔缩径,一次成孔达到设计要求的施工经验,对类似地区的钻探施工有一定的借鉴意义。 In the Kaiping syncline core coal prospecting area, Hebei Province, since the coal seam buried depth is quite deep, strata easy to cause borehole shrinking, as well as abnormal pressure have brought tremendous pressure on drilling operation. On February 19, 2011, the borehole ZK9-1 has completed its geological drilling task successfully. Practical borehole completion depth is 1950.68m, it is the deepest coalfield coring borehole in the country usingΦ50mm rod. The paper introduced the borehole operation from aspects of equipment selection, drilling tool using and its tensile strength and torque moment calibration, mud using, pressure balance drilling, de-viation preventing measures. The paper also introduced how to overcome deep borehole strata abnormal pressure, mudstone creeping caused borehole shrinkage, operation experiences of borehole completion with one effort and meeting design requirements. The study has certain reference significance for drilling operation in similar areas.
作者 钟强 钟明
出处 《中国煤炭地质》 2014年第3期64-65,74,共3页 Coal Geology of China
关键词 煤田普查 超深孔 Φ50mm钻杆 强度校验计算 施工技术 河北开平 coalfield prospecting super deep borehole Φ50mm rod strength checking calculation operation technology Kaiping He-bei
  • 相关文献

参考文献3

二级参考文献8

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部