期刊文献+

潍坊港中港区3.5万t级航道和防波挡沙堤的延伸方案 被引量:1

Auxiliary Sand Breakwater Extension Plan of 35 000 DWT Channel Project at Central Harbor of Weifang Port
下载PDF
导出
摘要 潍坊港地处莱州湾底部的粉砂质海岸,岸滩宽浅、泥沙运动活跃,在极端恶劣天气条件下,岸滩泥沙会大量悬浮,容易在航道内形成骤淤。中港区3.5万t级航道不仅需在现有1.0万t级航道基础上加宽、浚深和延长,其向外海延伸的航段已超出现有防波挡沙堤的掩护范围,防波挡沙堤需相应延伸以缓解大风天的航道泥沙骤淤,同时要辅以疏浚维护才能保持航道足够的通航水深。 Weifang Port is built on silt-sandy beach at the bottom of Laizhou Bay and is characterized by shallow wide beach and active sediment movement. Under extremely severe weather, a large amount of sediment is suspended, which may cause sudden sihation easily in the channel. In the construction of 35 000 DWT channel project at central harbor of Weifang Port, the existing lengthened. Since the section of channel extended to 10 000 DWT channel will be widened and dredged deeper and ocean isn't shielded, existing sand breakwater should be extended correspondingly to weaken sudden siltation of the channel under gale. In addition, the channel must be dredged and maintained periodically so as to ensure navigable water depth.
出处 《港工技术》 2013年第4期11-13,共3页 Port Engineering Technology
关键词 潍坊港 3 5万t级航道 防波挡沙堤 泥沙骤淤 疏浚维护 Weifang Port 35 000 DWT channel sand breakwater sudden siltation dredging and mainte- nance
  • 相关文献

参考文献3

二级参考文献4

  • 1交通部第一航务工程勘察设计院.海港工程设计手册(上册)[M].北京:人民交通出版社,2001.
  • 2JTJ211-99海港总平面设计规范[S].北京:人民交通出版社.1999.
  • 3JTS141-2011水运工程设计通则[S].北京:人民交通出版社.2011.
  • 4季则舟,侯志强.粉沙质海岸港口航道骤淤防治标准研究[J].港工技术,2010,47(1):11-13. 被引量:8

共引文献10

同被引文献16

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部