摘要
影响千米深孔地面预注浆止浆施工的因素复杂多样,诸多影响因素决定了止浆施工的成功率,运用因子分析方法对影响止浆施工的因素进行深入分析,归纳为3个公共因子:地质因素(F1)、注浆参数影响因素(F2)、止浆目标因素(F3),揭示了止浆施工过程中的影响因素综合作用的动态变化机理。通过对亳州煤业信湖煤矿主井地面预注浆工程施工案例分析,验证了因子分析方法的可行性。
The effect factors in the process of kilometer deep hole ground pre - grouting construction were analyzed in consideration of the diversity and complexity of stopping slurry construction by utilizing the method of factor analysis. Three public factors including geo- logical factor ( F1 ), grouting parameters influencing factor ( F2 ) and stopping slurry targets factor ( F3 ) on behalf of the success rate in stopping slurry construction were extracted. As a case, the analysis of ground pre - grouting construction in Xinhu Coal Mine was car- ried out for Bozhou Coal, in which the feasibility of the proposed method was verified by utilizing the method of Factor Analysis.
出处
《煤矿安全》
CAS
北大核心
2014年第3期145-149,共5页
Safety in Coal Mines
关键词
注浆工程
因子分析
主成分提取
止浆成败机理
止浆方案
地面注浆
grouting engineering
factor analysis
principal component extraction
stopping slurry success or failure mechanism
stop- ping slurry scheme
ground grouting