针对崖城作业公司南山终端液化石油气节能项目投产后出现天然气一级压缩机频繁关停造成天然气大量排放的问题,对投产前后的工艺参数进行比较、分析和调整,在不进行工程改造和提升设备技术水平的情况下,通过压缩机的负荷转移,解决了这一难题。
The Yacheng operating company Nanshanterminal’s 1 st gas compressor shut down frequent-ly after liquefied petroleum gas (LPG)project online,natural gas was wasted in large quantities.Com-bined with the actual situation of the existing equipment,comparative analysis and adj ustment of process parameters before and after the operation,through technological innovation,not changed the engineering and equipment’s existing conditions,the problem was solved.