摘要
分析了 110 k V架空线路由于雷击跳闸和振兴、坪二系统扩容改造 ,对攀钢供电系统可靠性带来的影响 ,提出了改善措施以求从整体上提高攀钢电网供电的可靠性。
The analysis was made on reliability of power supply system of Panzhihua Iron & Steel Co. due to lightening stroke and trip of 110 kV overhead line and expansion of Zhenxing power system and Pinger power system.Improving measures are given to enhance the reliability as a whole of power supply of the electric network.
出处
《冶金动力》
2000年第6期4-5,共2页
Metallurgical Power
关键词
供电系统
可靠性
钢铁厂
power supply system,reliability,improvement