摘要 以CaO—CaF2复合渣系为脱硫剂,在RH精炼过程采用真空投入法进行高牌号无取向电工钢深脱硫工业试验,采用KTH模型计算分析了RH炉渣成分对硫容量Cs的影响。研究结果表明,炉渣成分控制在w((CaO))/w((SiO2))为5~7,w((CaO))/w((Al2O3))为1.5~1.8,w((Al2O3))为25%~30%,w((Fe0+MnO))〈5%,脱硫剂加入量为6~8kg/t时,钢中硫质量分数从平均0.0031%降低到0.0018%,最高脱硫率达到47.1%,平均脱硫率为41.7%。 The industrial trials on deep desulphurization of high grade non-oriented electrical steel were finished through using CaO CaF2 complex based fluxes in RH process. Using the KTH model, the effect of refining slag composition on the sulfide capacities was analyzed. The results show that the chemical composition of refining slag (mass fraction,G) is w((CaO/ SiO2)) between 5 to 7, w((CaO))/w((Al2O3)) beween 1.5 to 1.8, w((Al2O3)) between 25% to 30%,w((FeO+MnO))less than 5%, and the desulphurizer addition level of 6-8kg/t can desul phurize mass fraction the liquid steel from average 0. 0031 % to 0.0018 %, and the highest and average desulphuriza tion ratios are 47.1% and 41.7%, respectively.
出处 《钢铁》 CAS CSCD 北大核心 2014年第2期40-44,共5页 Iron and Steel
关键词 无取向电工钢 RH 高牌号 脱硫 non oriented electrical steel RH high grade desulphurization
  • 相关文献

参考文献10

二级参考文献25

  • 1周宏,吴晓春,崔.硫在CaO-Al_2O_3系熔渣与钢液间的分配率[J].钢铁,1995,30(6):14-17. 被引量:22
  • 2郝宁,王海涛,王新华,李宏,王万军.硫容量和硫分配比的计算及分析[J].北京科技大学学报,2006,28(1):25-28. 被引量:18
  • 3卢凤喜,何敏.高牌号无取向电工钢生产技术[J].武钢技术,2006,44(6):13-16. 被引量:8
  • 4李军,杜炳坤.无取向硅钢薄带的研究[J].金属功能材料,1997,4(2):79-81. 被引量:11
  • 5黄璞,毛炯辉,陈卓,等.冷轧无取向电工钢生产研发趋势[N].世界金属导报,2009-11-10(47).
  • 6黄璞,毛炯辉,陈卓,等.国内冷轧无取向电工钢生产现状及技术水平[C]∥国内首届冷轧无取向电工钢生产与应用研讨会论文集.北海:中国金属学会电工钢分会,2009:46-47.
  • 7Hiroki Ohta, Hideaki Suito. Activities of SiOe and Al2O3 and Activity Coefficients of FetO and MnO in CaO-SiO2-Al2O3- MgO Slags [J]. Metall Trans B,1998,29 (1):119.
  • 8Sosinsky D J, Sommerville I D. The Composition and Temperature Dependence of the Sulfide Capacity of Metallurgical Slags [J]. Metall Trans B,1986,17 (6):331.
  • 9Young R W,Duffy J A,Hassal G J. Use of Optical Basicity Concept for Determining Phosphorus and Sulphur Slag-Metal Partitions[J]. Ironmaking and Steelmaking, 1992, 19 (3) : 201.
  • 10Nzotta M M,Sichen Du,Seetharaman S. Sulphide Capacities in Some Multi Component Slag System [J]. ISIJ Inernational,1998,38(13) :1170.

共引文献31

同被引文献53

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部