摘要
针对湿陷性黄土地基 ,结合工程实际中灰土挤密桩的处理方法 ,通过实际设计与应用 ,解决了实际工程中经常遇到的湿陷性黄土层过厚 ,处理深度较大 ,工期过长 ,造价较高等问题 .
Through practical design and application ,the treatment of lime-and-ash pile in engineering adopted according to collapsible loess is used to solve many problems,we have encountered in actual construction, i.e, thicker collapsible loess layer too much depth,much longer time for a project and higher cost etc.
出处
《兰州铁道学院学报》
2000年第6期60-62,共3页
Journal of Lanzhou Railway University