摘要
湍河渡槽是南水北调中线一期工程的一种交叉渠系建筑物,针对其跨度大、流量大、结构复杂等特点,综合分析后提出采用双槽矩形断面形式。通过对比4种方案,从槽下净空、上游雍水、应力控制、施工、投资等5个方面分析计算,认为"U"型槽为最优方案,但也需要调整槽跨才能满足壅水高度标准。
Tuanhe aqueduct is one of the cross canal structures of the first phase of South-to-North Water Transfer Project .Due to its characteristics of large structure span ,great discharge ,and complex structure ,double chamfer rectangle section is selected for the aqueduct .Four schemes were compared from the five following aspects :net space below chamfer ,upstream backwater , stress control ,construction ,and investment ,and“U”-type aqueduct scheme was considered as the best .However ,the structure span has to be adjusted to meet the backwater height requirements .