地面注浆充填加固技术在立井穿过多层采空区施工中的应用 被引量:8

Application of Surface Ground Grouting Backfill Reinforcement Technology to Mine Shaft Sinking Passing Through Multi Mining Goaf
下载PDF
导出
摘要 马脊梁矿副立井和回风立井凿井施工中,需穿过侏罗系2号、11号煤层采空区。在凿井施工揭露煤层采空区前,采用地面注浆充填加固技术,使用水泥粉煤灰浆液,对采空区进行了治理。每个井筒在地面布置4圈注浆孔,圈径分别为24,30,60,72 m ,每圈布置4~6个孔,注浆压力2.0~3.0M Pa。副立井共注入水泥粉煤灰浆液16750m3,回风立井共注入17235m3,使采空区得到了有效的充填加固。2个井筒凿井施工时,均安全快速地通过了采空区。 In the mine shaft sinking operation of the mine auxiliary shaft and the mine air return shaft in Majiliang Mine ,the two shaft sinking operations were passed through the mining goaf in Jurassic Sys-tem No.2 seam and No.11 seam.Before the mining goaf of the seam exposed in the mine shaft sinking operation ,a surface ground grouting backfill reinforcement technology with cement and fly ash grout was applied to the treatment of the mining goaf.There were 4 circles of the grouting boreholes made around the surface ground of each mine shaft ,the diameters of the circles were 24 ,30 ,60 and 72m , there were 4~6 boreholes set in each circle and the grouting pressure was 2.0~3.0MPa.There were 16 750m3 of the cement and fly ash grout totally injected in the mine auxiliary shaft ,there were 17 235 m3 of the cement and fly ash grout totally injected in the mine air return shaft and an effective backfill reinforcement was obtained in the mining goaf.In the mine shaft sinking operations of the two mine shafts ,all two mine shafts were safely and rapidly passed through the mining goaf.
作者 周建峰
出处 《建井技术》 2014年第1期8-12,共5页 Mine Construction Technology
基金 大同煤矿集团项目:千万吨矿井群复杂地层建井关键技术及数字矿山信息化研究(HTGJZB-TM1307303-2)
关键词 立井 采空区 地面注浆 水泥粉煤灰浆液 mine shaft mining goaf surface ground grouting cement and fly ash grout
  • 相关文献

参考文献3

二级参考文献11

  • 1张春武.用综合评价系数求取邢东矿井岩移参数[J].河北煤炭,2002(6):46-47. 被引量:5
  • 2戈海宾,张玉建,余同勇.煤矿开采沉陷有效控制新途径的探讨[J].矿业安全与环保,2006,33(1):71-72. 被引量:13
  • 3张刚艳,王明立.刘家渠煤矿井筒及工业广场下采空区治理方案[R].北京:天地科技股份有限公司开采设计事业部,2009.
  • 4张刚艳,甘志超,李磊,等.刘家渠煤矿井筒及工业广场下采空区治理效果综合检测及评价[R].北京:天地科技股份有限公司开采设计事业部,2010.
  • 5煤炭科学研究院,北京开采研究所.煤矿地表移动与覆岩破坏规律及其应用[M].北京:煤炭工业出版社,1981.
  • 6国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M].北京:煤炭工业出版社,2000..
  • 7GB 50215-2005,煤炭工业矿井设计规范[S].
  • 8王杰.岩土注浆理论与工程实例[M].北京:科学出版社,2001.
  • 9钱呜高,刘听成.矿山压力及其控制[M].北京:煤炭工业出版社,1984.2.
  • 10国家煤炭工业总局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M].北京:煤炭工业出版社,2000.

共引文献10

同被引文献63

引证文献8

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部