摘要
陈四楼煤矿21503综采工作面因受地质构造影响设计为里、外两段,介绍了21503综采工作面里段回采完毕后搬家至外切眼的方法,针对工作面在搬家过程受运输条件复杂、断层构造以及老塘水等复杂条件的影响,分析了21503综采工作面的搬家过程,可为类似条件综采工作面的搬家积累宝贵经验。
Due to the influence of geological structure,21503 fully mechanized working face of Chensilou coal mine is designed inside and outside two parts,the method is introduced that remove to outer open-off cut after the inside part of 21503 fully mechanized working face is mined. Aiming at the influence that the process of remove is affected by complex conditions such as complex transportation condition,fault structure and goaf water and so on,analyzes the remove process of 21503 fully mechanized working face,it can accumulate precious experiences for working face removing on similar condition.
出处
《山西焦煤科技》
2014年第4期13-15,19,共4页
Shanxi Coking Coal Science & Technology
关键词
综采工作面
复杂条件
搬家
Fully mechanized working face
Complex conditions
Remove