陈四楼煤矿21503综采工作面搬家工艺探析 被引量:3

Analysis on Remove Process of 21503 Fully Mechanized Working Face in Chensilou Coal Mine
下载PDF
导出
摘要 陈四楼煤矿21503综采工作面因受地质构造影响设计为里、外两段,介绍了21503综采工作面里段回采完毕后搬家至外切眼的方法,针对工作面在搬家过程受运输条件复杂、断层构造以及老塘水等复杂条件的影响,分析了21503综采工作面的搬家过程,可为类似条件综采工作面的搬家积累宝贵经验。 Due to the influence of geological structure,21503 fully mechanized working face of Chensilou coal mine is designed inside and outside two parts,the method is introduced that remove to outer open-off cut after the inside part of 21503 fully mechanized working face is mined. Aiming at the influence that the process of remove is affected by complex conditions such as complex transportation condition,fault structure and goaf water and so on,analyzes the remove process of 21503 fully mechanized working face,it can accumulate precious experiences for working face removing on similar condition.
作者 黄辉
出处 《山西焦煤科技》 2014年第4期13-15,19,共4页 Shanxi Coking Coal Science & Technology
关键词 综采工作面 复杂条件 搬家 Fully mechanized working face Complex conditions Remove
  • 相关文献

参考文献5

二级参考文献4

  • 1国家安全生产监督管理局,国家煤矿安全监察局.煤矿安全规程[M].北京:煤炭工业出版社,2010.
  • 2国家安全生产监督管理局,国家煤矿安全监察局.煤矿安全规程[M].2005.
  • 3马新民.矿山机械[M].徐州:中国矿业大学出版社,2005.
  • 4陈维健,齐秀丽,肖林京,等.矿山运输与提升设备[M].徐州:中国矿业大学出版社,2007.

共引文献100

同被引文献6

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部