期刊文献+

基于D5000系统的风电优先调度工作方案设计与应用

Design and Application of Wind Power Priority Dispatching Plan Based on D5000 System
下载PDF
导出
摘要 近年来由于风电迅猛发展,大幅度超前电网建设和社会用电负荷增长,受网架约束和电网调峰问题影响,风电出力受阻的情况时有发生,风电消纳已成为困扰电网和风电场的共同问题。依据《风电优先调度工作规范》,基于智能调度技术支持系统建设,设计新疆电网风电优先调度工作方案,有利于在保证电网安全稳定运行的前提下,实现新能源消纳最大化的目标。 In recent years , the rapid development of wind power generation in Xinjiang is much faster than the development of grid construction and the increasing of customers ′loads.And restricted by the grid structure and influenced by dispatching ca -pability, the blocking of wind power output happens quite often , so wind power accommodation becomes the common problemobsessing the grid and wind farms.On the basis of "Wind Power Priority Dispatching Specification "and the construction ofsmart grid operation supporting system, the wind power priority dispatching plan is designed for Xinjiang , which can realizethe accommodation maximization of new energy in the premise of ensuring the safe and stable operation of power grid .
出处 《四川电力技术》 2014年第3期24-28,共5页 Sichuan Electric Power Technology
关键词 智能调度 风电优先调度 发电计划 风电理论功率 intelligent dispatching wind power priority dispatching generation scheduling theoretical wind power
  • 相关文献

参考文献8

二级参考文献40

  • 1曹昉,张粒子.结合系统调峰容量比确定抽水蓄能机组装机容量的方法[J].电力自动化设备,2007,27(6):47-50. 被引量:24
  • 2John Kabouris, Kanellos F D. Impacts of large-scale wind penetration on designing and operation of electric power systems[J]. IEEE Transactions on Sustainable Energy, 2010, 1(2): 107-115.
  • 3XIE Kai-gui, Billinton Roy. Determination of the optimum capacity and Ttype of wind turbine generators in a power system considering reliability and cost[J]. IEEE Transactions on Energy Conversion, 2011, 26(1): 227-235.
  • 4XIE Le, LIOE Ju-hua, Nipun Popli. Wind integration in power systems: operational challenges and possible solutions[J]. Proceedings of the IEEE, 2011, 99(1): 214-233.
  • 5XIE Le, LIU Ju-hua, Niptm Popli. Wind integration in power systems: operational challenges and possible solutions[J]. Proceedings of the IEEE, 2011, 99(1): 214-233.
  • 6FINK S,MUDD C,PORTER K,et al.Wind energy curtail-ment case studies May 2008-May 2009[R].National Re-newable Energy Laboratory:2009.
  • 7ROGERS J,FINK S,PORTER K.Examples of wind energycurtailment practices[R].National Renewable Energy Labo-ratory:2010.
  • 8National Center for Atmospheric Research. NCAR as an integrator, A Vision the Atmospheric Sciences and Geosciences National Center for Atmospheric Research[EB/OL]. http://www.ncar.ucar.edu, 2001.
  • 9Board on Atmospheric Sciences and Climate: The Atmospheric Sciences Entering the Twenty-First Century[R]. National Academies Press, 1998.
  • 10水电水利规划设计总院.抽水蓄能与风电配合运行研究[R].北京:水电水利规划设计总院,2011.

共引文献278

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部