摘要 根据成都地区某高层建筑深基坑护壁桩的实测资料,采用数值方法分析了护壁桩在基坑开挖过程中的变形规律.计算结果表明护壁桩具有柔性支护构件特征,由于圈梁对桩顶的有效约束使护壁桩的变形状态不同于悬臂构件.文中对桩顶圈梁的约束作用也进行了讨论. Based on the measurements of the bending moments of two retaining piles in an excavation, a numerical method is applied to analyze the pile deformation and the binding forces of the top ring beam. It is shown that the retaining piles are flexible. The restraining forces on the top of the pile make the retaining piles work differently from the upright free-head shaft and should be taken into consideration in the design.
出处 《力学与实践》 CSCD 北大核心 2001年第1期20-23,26,共5页 Mechanics in Engineering
关键词 桩排式支护 护壁桩 变形状态 圈梁约束 深基坑 开挖 pile row retaining system, retaining pile, deformation condition, binding forces
  • 相关文献

参考文献4

  • 1胡敏云.深基坑桩排式支护桩侧土压力与设计方法研究(博士学位论文)[M].西南交通大学,1998..
  • 2曾庆义.高层建筑深基坑排桩支护体系力学模型与设计理论(博士学位论文)[M].武汉水利电力大学,1995..
  • 3胡敏云,博士学位论文,1998年
  • 4曾庆义,博士学位论文,1995年

同被引文献27

引证文献3

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部