机器人制造单元的建模与任务调度策略 被引量:6

Modeling and Task Scheduling Strategy for Robot Manufacturing Cell
下载PDF
导出
摘要 机器人资源的合理分配和调度是提高制造单元系统柔性的关键。本文针对一类机器人制造单元的最小周期调度问题 ,应用极大代数方法建立了单元系统的调度模型 ,提出了基于禁忌搜索的启发式调度策略 ,并给出了初始可行解和搜索邻域的构造方法 ;最后 ,通过具体的运算实例 ,验证了所提出方法具有较高的效率 ,能够解决较大规模的最小周期调度问题 。 Properly scheduling and dispatching robot resource is very important for improving flexibility of the robotic cell system. Taking the cyclic scheduling problem for robot manufacturing cell as subject investigated, a scheduling model of the cell system is constructed by using max-algebra method.A tabu search strategy for finding minimal cycle time is proposed, and the construction method of initial solution and search neighborhood is also given in this paper. Computation sample shows that the search method in this paper has good performance. It can solve cyclic scheduling problem for large scale robotic cells and has broad applicability.
出处 《计算机集成制造系统-CIMS》 EI CSCD 北大核心 2001年第4期7-11,共5页
关键词 建模 任务调度策略 工业机器人 制造单元 目标函数 robot manufacturing cell max-algebra tabu search cyclic scheduling
  • 相关文献

参考文献1

  • 1Chen H G,J Manufact Syst,1994年,13卷,1期,31页

同被引文献173

  • 1周支立,李怀祖.具有材料搬运装置的机器排序问题综述[J].中国机械工程,2001,12(z1):165-168. 被引量:1
  • 2吕文彦,党延忠.基于B-T规则与遗传算法的可重入生产系统调度[J].系统仿真学报,2005,17(4):993-996. 被引量:9
  • 3梁旭,黄明.禁忌-并行遗传算法在作业车间调度中的应用[J].计算机集成制造系统,2005,11(5):678-681. 被引量:9
  • 4韩伟一,王铮.负权最短路问题的新算法[J].运筹学学报,2007,11(1):111-120. 被引量:13
  • 5SHAPIRO G W,NUTTLE H W.Hoist scheduling for a PCB electroplating facility[J].HE Transactions,1988,20(2); 157-167.
  • 6CHEN Haoxun,CHU Chengbin,PROTH J M.Cyclic scheduling of a hoist with time window constraints[J].IEEE Transactions on Robotics and Automation,1998,14(1):144-152.
  • 7CHE Ada,CHU Chengbin.Multi-degree cyclic scheduling of two robots in a no-wait flowshop[J].IEEE Transactions on Automation Science and Engineering,2005,2(2),173-183.
  • 8CHE Ada,CHU Chengbin.Cyclic hoist scheduling in large reallife electroplating lines[J].OR Spectrum,2007,29(3),445-470.
  • 9CHE Ada,CHU Chengbin.Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots[J],European Journal of Operational Research,2009,199(1),77-88.
  • 10PAUL H J,BIERWIRTH C,KOPFER H.A heuristic scheduling procedure for multi-item hoist production lines[J].International Journal of Production Economics,2007,105(1),54-69.

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部