摘要
论述了全厂瓦斯高压、低压管网及火炬系统的改造方案,分析了有关的经济效益。
improvement plan for the high pressure and low pressure gas pipe network and flare system in the whole plant is discussed and relative economic benefit is analysized.
出处
《黑龙江石油化工》
2001年第1期6-7,14,共3页
Heilongjiang Petrochemical Technology