三峡二期上游围堰三维有限元应力应变分析 被引量:9

3-D FEM analysis on phase-Ⅱ cofferdam of the Three Gorges Project
原文传递
导出
摘要 三峡工程二期围堰塑性混凝土防渗墙的应力变形是衡量围堰安危的重要指标。由于该围堰的运用期为 5年 ,根据试验确定的塑性混凝土不同龄期的 Duncan- Chang E-μ模型参数 ,按照实际施工程序 ,考虑时空变化的影响 ,对二期围堰进行了应力变形三维有限元计算 ,分析了大规模抽水期和运行期围堰防渗墙应力特征和变形情况 ,同时将计算结果与实测结果及反馈分析结果进行比较。计算分析表明围堰堰体和防渗墙体是安全的。 The stress and deformation of the phase Ⅱ cofferdam of the Three Gorges Project, especially those of the cutoff walls, are the key safety indexes of the cofferdam. This paper studies the stress and deformation of the cofferdam during periods of large scale pumping and running using 3 D finite element method (FEM) analysis according to the actual construction process and the Duncan Chang E μ model parameters for different ages of plastic concrete. The calculated results are compared with observed information and it is demonstrated that the cofferdam is and will be safe. The results also provide valuable suggestions for the safe running of the cofferdam.
出处 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2001年第4期240-243,共4页 Journal of Tsinghua University(Science and Technology)
关键词 三维有限元分析 塑性混凝土 三峡二期围堰 防渗墙 应力变形 围堰运行期 大规模抽水期 D finite element method (FEM) analysis plastic concrete phase Ⅱ cofferdam of the Three Gorges Project
  • 相关文献

参考文献4

  • 1胡黎明,濮家骝.施工及运行期三峡二期围堰防渗墙有限元分析[J].水利水电技术,1999,30(5):64-66. 被引量:6
  • 2冯光愈 沈珠江.三峡工程二期围堰技术设计低双墙方案应力应变分析综合报告[M].武汉:长江科学院,1996..
  • 3Zhang Jianhong,Tsinghua Sci Technol,1999年,4卷,1期,1367页
  • 4冯光愈,三峡工程二期围堰技术设计低双墙方案应力应变分析综合报告,1996年

共引文献5

同被引文献55

引证文献9

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部