介绍了宁波招宝山大桥主桥主梁局部拆除施工方法 。
The construction method and safety technological measures for partial dismantlement of the main girder of Zhaobaoshan bridge in Ningbo.
出处
《桥梁建设》
EI
CSCD
北大核心
2001年第3期13-17,共5页
Bridge Construction
关键词
斜拉桥
预应力混凝土梁
拆除
施工技术
安全措施
cable stayed bridge
prestressed concrete girder
disassembling
construction technology
safety measure