摘要
介绍了武汉长江二桥斜拉桥8m主梁的施工步骤和主梁施工的工艺要点及主梁施工监控。
Construction procedures,technological requirements and construction control for 8-m segments ofmain girders of cable-stayed spans of the Second Changjiang River Bridge in Wuhan are elaborated.