期刊文献+

河工动床模型存在问题及其解决途径 被引量:18

Problems and Their Solutions in Physical Modeling of River Process in Alluvial Streams
下载PDF
导出
摘要 河工模型是解决江河治理及大型水利水电工程泥沙问题的主要手段。本文研究了河工动床模型设汁与试验过程中存在的几何变态、推移质泥沙级配选配、时间变态等问题,并提出了相应的解决途径和建议。 The physical modeling is still a main approach to solve the sedimentation problems existing in the large stream training and hydraulic projects. In this paper, some key problems, usually found in the designing of physical model and conducting physical modeling, such as geometrical distortion; time distortion, and modeling of composition of bed load are discussed, and also the feasible solutions to them are proposed in this paper.
出处 《水科学进展》 EI CAS CSCD 北大核心 2001年第3期418-423,共6页 Advances in Water Science
基金 全国高等院校优秀博士论文作者专项基金资助。
关键词 河工模型 推移质模拟 变态 含沙量比尺 推移质泥沙 Computer simulation Hydraulic models River basin projects Sedimentation
  • 相关文献

参考文献15

  • 1张红武 黄河水利委员会水利科学研究所.河工模型变率及弯道环流的研究.科学研究论文集(第1集)[M].郑州:河南科学技术出版社,1989..
  • 2谢鉴衡.河流泥沙工程学(下册)[M].北京:水利出版社,1981.212-223.
  • 3张红武.论动床变河工模型的相拟律.黄科所科学研究论文集,第2集[M].郑州:河南科学技术出版社,1990.269-284.
  • 4潘庆chan 杨国录 等.三峡工程泥沙问题研究[M].北京:中国水利水电出版社,1999.252-293.
  • 5张红武.冲积河床糙率模拟剖问题的探讨[J].武汉水利电力学院学报,1986,(3):36-42.
  • 6彭润泽 常德礼 等.用水槽模拟试验求卵石河床推移质输沙率[J].泥沙研究,1984,(3):27-38.
  • 7潘庆--,三峡工程泥沙问题研究,1999年,252页
  • 8刘有录,桥渡,1995年,180页
  • 9张红武,黄河高含沙洪水模型的相似律,1994年
  • 10张红武,黄科所科学研究论文集第2集,1990年,269页

共引文献4

同被引文献173

引证文献18

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部