摘要
本文研究一种混联水电站水库群中长期优化调度的多维动态规划模型的求解方法。在编程中充分利用面向对象的C + +语言的优势 ,并采用DDDP法减少状态可行域 ,使得以往被认为具有“维数灾”的多维问题能直接求解。
In this paper a resolving method of multivariate dynamic programming model to mid and long term optimum operation for large scale hydropower system is studied.At the same time,fully harnessing the overweight of Object oriented C++ language and DDDP method to reduce the feasible space of station in programming,it can directly got result to the high dimension problem which used to known as “dimensionalyity trobule”.
出处
《水力发电学报》
EI
CSCD
北大核心
2001年第3期68-74,共7页
Journal of Hydroelectric Engineering
关键词
混联水电站
水库群
联合优化调度
Mixed multi reservoirs\ \ Uniting optimum operation\ \ Object oriented technique\ \ Class\ \ Dynamic distribution of stored space