摘要
阐述原苏制 6 70t/h锅炉低负荷运行时磨煤机干燥出力严重下降和导致制粉系统单耗剧增的原因 。
During the low load operation of a 670 t/h Soviet-made boiler there emerged a dramatic reduction in coal mill drying capacity, which led to a drastic increase in unit consumption of energy. To cope with the problem, proper measures were put forward, which consist in opening the air damper of a primary air pipe (not fed with pulverized coal), which pertains to one of the pulverized coal preparation system.
出处
《热能动力工程》
EI
CAS
CSCD
北大核心
2001年第6期666-668,共3页
Journal of Engineering for Thermal Energy and Power