摘要
根据榆林榆阳机场工程总承包(EPC)项目的设计实践,从设计管理的角度出发,对比分析EPC模式与传统模式的区别和联系,归纳出EPC项目中设计管理在不同阶段的工作要点,探讨民航领域在EPC模式下的项目特点和发展趋势。
According to the design practice of engineering procurement construction(EPC) project of Yulin Yuyang Airport, from the perspective on design management, the differences and relations between EPC mode and traditional mode were compared and analyzed, and the key points of design management in different stages of EPC project were summarized. The project characteristics and development trends of EPC mode were discussed.