摘要
结合江苏省通海码头一期工程,对BIM技术在水运工程中的应用进行了研究。从BIM模型的建立及图纸找错、应用BIM优化现场施工布署、模拟及交底施工方案、实现数据一体化管理、施工现场信息化管理等方面,对BIM的应用进行了介绍,并对BIM的应用效果和后续研究方向进行了总结。
Combined with the first phase project of Tonghai Wharf in Jiangsu Province, the application of BIM technology in water transport project is studied in this paper. The applications of BIM are introduced from the establishment of BIM model and the error identification in drawings, the application of BIM to optimize on-site construction arrangement, simulation and interpretation of construction scheme, realization of data integration management, the information management of construction site and so on. Finally, the application effects and subsequent research directions are summarized.
作者
顾晓彬
张晓辉
GU Xiaobin;ZHANG Xiaohui(No.3 Engineering Co.,Ltd.of CCCC Third Harbor Engineering Co.,Ltd.,Nanjing,Jiangsu 210011,China)
出处
《建筑施工》
2018年第12期2151-2154,共4页
Building Construction
关键词
BIM
水工码头
施工应用
精细化管理
BIM
hydraulic wharf
construction application
refined management