摘要 厦门市轨道2号线海沧大道站-东渡路站跨海隧道区间采用泥水平衡式盾构机施工。盾构机刀盘直径为7 043 mm,管片外径为6 700 mm,管片宽度为1 500 mm。跨海区间穿越地层地质条件非常复杂,先后穿越淤泥层,强风化、中风化变质砂岩以及微风化变质石英砂岩层等,其中隧道穿越F8、F10风化深槽。左线正常掘进施工至412环时出现异常现象,当推进至417环时,刀盘完全卡死无法转动,盾构机顶部海床塌陷,停止推进。经地质勘探后,探明原因为地层突变遇孤石群。打捞气泡舱底部淤积的石头及刀具,采取多种保压措施,满足高压进仓条件后带压进仓更换刀具、清理开挖仓、处理孤石。采取合理有效的措施后,左线417环出现的刀盘卡死、海床塌陷等异常情况得以解决,重新恢复掘进。 The slurry balanced shield machine is used in the cross-sea tunnel section of Haicang Avenue Station-Dongdu Road Station of Xiamen Railway Line 2. The diameter of shield cutter plate is 7 043 mm, the outer diameter of the segment is 6 700 mm, and the width of the segment is 1 500 mm. The geological conditions of the cross-sea subway tunnel were very complicated, it passed through various layers with silt stratification, strong weathering, medium weathering metamorphic rock and weak weathering metamorphic quartz sandstone, among which the tunnel passed through F8 and F10 weathered deep troughs. When the left line was normally pushed into the 412 ring, an abnormal phenomenon occurred. When it was pushed into the 417 ring, the cutting wheel was completely stuck and could not be rotated, and the seabed at the top of the shield collapsed, then stopped. After geological exploration, the reason was proved that it was the statum mutation encountered in the boulder group. The stones and cutters at the bottom of the bubble chamber were salvaged, and a variety of pressurepreserving measures were taken to replace the damaged cutters, clean the excavation cabin and handle the stones under meeting the high pressure entry conditions. After taking reasonable and effective measures, the problems were resolved and the tunnelling was resumed.
作者 陈辰 Chen Chen(China Railway 14^th Bureau Group Co.Ltd.,Ji'nan Shandong 250000,China)
出处 《铁道建筑技术》 2018年第12期93-95,99,共4页 Railway Construction Technology
基金 中铁十四局集团有限公司技术开发项目(2016-0457)
关键词 跨海地铁 泥水平衡盾构机 孤石群 高压进仓 cross-sea subway slurry balanced shield machine boulders chamber-entering under high pressure
  • 相关文献

参考文献11

二级参考文献51

  • 1韩晓瑞,朱伟,刘泉维,钟小春,闵凡路.泥浆性质对泥水盾构开挖面泥膜形成质量影响[J].岩土力学,2008(S01):288-292. 被引量:87
  • 2孙善辉,洪开荣,陈馈.盾构饱和气体带压进舱技术研究[J].建筑机械化,2012,33(S2):119-123. 被引量:7
  • 3黄威然,竺维彬.泥水盾构过江工程江底塌方风险的应对及处理[J].现代隧道技术,2006,43(2):49-53. 被引量:19
  • 4陈洁,马星民,董柏峰,吴淼.高浓度粘稠物料搅拌装置的研制与应用[J].机电产品开发与创新,2007,20(1):38-39. 被引量:5
  • 5朱维申 何满潮.复杂条件下围岩稳定性与岩体动态施工力学[M].北京:科学出版社,1996..
  • 6陈馈.狮子洋隧道sDⅢ标盾构选型设计与对接施工[C]//中国中铁隧道集团2007年水底隧道专题技术交流大会论文集.河南洛阳:中铁隧道集团有限公司,2007:146-150.
  • 7徐军哲.盾构带压进仓作业工法(3.6bar以内)[C]//中国中铁隧道集团工法专辑.洛阳:中铁隧道集团有限公司,2006.
  • 8郑清君,梁奎生,李凤远,等.狮子洋隧道盾构掘进施工危险源分析及对策[C]//中国中铁隧道集团2008年盾构(TBM)隧道专题技术交流大会论文集.河南洛阳:中铁隧道集团有限公司,2008:62-65.
  • 9GB50446-2008,盾构法隧道施工与验收规范[S].
  • 10梁炯塑.锚固与注浆技术手册[K].北京:中国电力出版社,1999.