摘要
该文主要阐述湘潭电厂 2× 30 0MW机组DCS系统的结构、特点、硬件配置、控制范围及功能。并结合 1号机组投运以来的运行维护情况 ,着重对整个系统的一体化配置的合理性及存在的问题进行分析讨论。图 2表 1。
The paper, in the main, elucidates the DCS system's structure, special features, hard ware collocation, scope and potential of control Xiangtan Power Plant's 2×300 MW set. Moreover, the paper, in connection with operation and maintenance experience of set No.1 since commissioning, discusses and analyzes the rationality of unified collocation as well as existing problems of the whole system. Figs 2 and table 1
出处
《发电设备》
2002年第2期24-27,共4页
Power Equipment