摘要
针对武钢热轧厂生产实际情况 ,为充分合理地利用能源 ,解决浊环水系统P10 7、P10 8泵组利用率低的问题 ,提出对其进行综合改造 ,以期达到既能满足生产需要 。
In order to make use of the energy sources more effectively and solve the problem of low utilization existing in the pump set p107 and p108 of the waste water recirculation system a comprehensive revamp plan has been formed in light of the actual production conditions in the Hot Rolling Strip Mill so as to attain the purpose oif meeting the demands of production and cutting down the energy consumption.
出处
《武钢技术》
CAS
2002年第3期28-29,59,共3页
Wisco Technology
关键词
经济效益
浊环水系统
泵组
节能
改造
热轧厂
waste water recirculation system pump set energy saving effect