期刊文献+

The Burning Question

The Burning Question
原文传递
导出
摘要 Once a week, on every Saturday since July 10, the Guangzhou No.1 Resource Thermo Power Plant in south China's Guangdong Province opens its door to visi- tors, While most thermal power plants in China are coal-fired, this plant burns a more unusual fuel---municipal waste. Located in Yongxin8 Village, Baiyun District of Guangzhou, the plant--also known as the Ukeng Waste Incinerator---is one of seven solid waste incinerators that have and will be built in the capital city of Guansdong. The first phase of the plant was put into use in January 2006 and can dispose of 1,040 tons of waste a day. The second phase, which has been in operation sinceJune 2013, can handle 2,250 tons daily. Waste incinerators,efficient at garbage disposal,are met with a skeptical public By Wang Hairong Once a week,on every Saturday since July 10,the Guangzhou No.1 Resource Thermo Power Plant in south
作者 Wang Hairong
出处 《Beijing Review》 2014年第30期32-33,共2页 北京周报(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部