智利查考大桥EPC投标主桥施工方案 被引量:1

Construction Scheme of EPC Mode Proposed for Main Bridge of Chacao Bridge in Chile
下载PDF
导出
摘要 查考大桥(Puente Chacao)位于智利南部,连接智利本土和奇洛埃岛,由智利公共工程部面向国际招标,采用EPC模式建设。中国一家联合体提交的投标方案为(216+1 045+1 190+319)m的三塔两跨连续钢箱梁悬索桥。为了满足招标文件对工程功能及施工工期的要求,对各重要的施工分项经过方案比选后确定:桥塔均采用混凝土塔,塔柱采用液压爬模分节段现浇;南塔和中塔桥塔基础采用扩大基础,北塔采用钻孔灌注桩基础,南、北锚碇均采用重力式锚碇,基坑采用分台阶明挖;加劲梁采用钢箱梁,在国内加工完成后节段整体海运至桥位,采用跨缆吊机吊装架设;主桥设2根主缆,采用PPWS法架设。 Chacao bridge is located in the south of Chile ,linking the mainland and Chiloe Is-land .The tender conducted by Chile′s Department of Public Works is for companies worldwide , and the project will adopt EPC mode . A consortium from China proposed a scheme of (216 +1 045+1 190+319)m three-tower two-span continuous steel box girder suspension bridge .To ac-commodate functions of the project and the construction schedule prescribed in the tender docu-ments ,the solutions for each key construction items were determined through scheme comparison and selection .All the towers are concrete towers ,the columns of which are cast in situ in sections by hydraulic climbing formwork .Spread foundations are chosen for the south and intermediate towers ,and the bored pile foundation for the north tower .The south and north anchor blocks are of gravity type ,foundation pits of which are to be excavated in steps .The stiffening girder adopts steel box girder ,w hich is to be fabricated in China in segments before being shipped to the bridge site .The girder sections will be erected by cable cranes .The main bridge has two main cables which are erected by parallel wire strand method .
出处 《世界桥梁》 北大核心 2014年第4期20-24,共5页 World Bridges
关键词 三塔悬索桥 桥塔 钢箱梁 主缆 猫道 锚碇 施工 three-tower suspension bridge bridge tower steel box girder main cable cat-walk anchor block construction
  • 相关文献

参考文献7

二级参考文献34

  • 1韦世国,薛光雄,李海,杨萍,蒙伟.润扬大桥悬索桥上部结构安装施工总体方案综述[J].桥梁建设,2004,34(4):17-20. 被引量:5
  • 2薛光雄,金仓,杜洪池,葛国库,先正权.润扬大桥悬索桥牵引系统设计与施工[J].桥梁建设,2004,34(4):25-28. 被引量:8
  • 3杨学祥,张明卓,朱艳,张靖.大跨度悬索桥施工猫道若干问题综述[J].世界桥梁,2007,35(2):61-64. 被引量:17
  • 4杨进.泰州长江公路大桥主桥三塔悬索桥方案设计的技术理念[J].桥梁建设,2007,37(3):33-35. 被引量:51
  • 5中华人民共和国国家质量监督检验检疫总局.GB/T228-2002金属材料室温拉伸试验方法[S].北京:中国标准出版社,2002.
  • 6安徽省公路勘测设计院,中铁大桥勘测设计院有限公司.马鞍山长江公路大桥及接线工程初步设计[Z].马鞍山:2008.
  • 7中华人民共和国国家质量监督检验检疫总局,中国国家标准化管理委员会.GB8918-2006重要用途钢丝绳[S].北京:中国标准出版社,2006.
  • 8中华人民共和国煤炭工业部.MT717-1997煤矿重要用途在用钢丝绳性能测定方法及判定规则[S].北京:中国煤炭工业出版社,1998.
  • 9中华人民共和国国家质量监督检验检疫总局,中国国家标准化管理委员会.GB/T5972-2006起重机用钢丝绳检验和报废实用规范[S].北京:中国标准出版社,2006.
  • 10中华人民共和国国家发展和改革委员会.MT970-2005钢丝绳(缆)在线无损定检测方法和判定规则[S].北京:中国煤炭工业出版社,2006.

共引文献97

同被引文献7

引证文献1

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部