摘要 为了在配电网无功优化配置中考虑到未来规划年的各种负荷分布,提出了基于负荷持续模型的10kV配电线路无功优化配置模型及算法;通过对历史日负荷持续曲线的聚类分析及选择合适算法,得到了各季节的代表日,对代表日的代表时刻又提出了相应的选择方法,从而提出了具有依据的配电网未来长期运行的代表断面负荷模型,并提供了等效运行时间计算方法。研究结果表明,该方法既避免了过于简单的负荷模型带来的决策质疑,也避免了复杂化负荷模型带来的繁重计算。该方法已在县级电网进行了应用,说明了其可行性与正确性。 In oder to consider the load variation for future planning years, in the the model and algorithm for 10 kV distribution line reactive optimal configuration based on load duration model were presented. By the cluster analysis of historic daily load duration curves, a calculation method for the representative day for all seasons together with a calculation method for the representative hour for the representative days, were presented to calculate the equivalent operation time. The reasearch results indicate that this method can make the load model much more practical and refined, and make the distribution line reactive configuration optimization to avoid the doubts by using simple data model, or the heavy calculation by adopting a very complicated load model. Real application has approved the feasibility and correctness of such modeling.
出处 《机电工程》 CAS 2014年第7期937-941,共5页 Journal of Mechanical & Electrical Engineering
关键词 配电网 无功优化配置 负荷持续模型 聚类分析 代表日等效运行时间计算 代表时刻等效运行时间计算 distribution network reactive optimal configuration duration load model cluster analysis calculation of equivalent operation time of representative day calculation of equivalent operation time of representative hour
  • 相关文献

参考文献12

二级参考文献95

共引文献410

同被引文献15

  • 1翁利民,靳剑峰.电力系统无功优化方法综合分析[J].电力电容器,2004(2):1-4. 被引量:19
  • 2林海源.交流模型下电力系统概率潮流计算[J].电力自动化设备,2006,26(6):53-56. 被引量:7
  • 3BORKOWSKA B.Probabilistic load flow[J].IEEE Transaction on Power Apparatus and Systems,1974,3(3):752-755.
  • 4SILVA M L D,ARIENTI V L.Probabilistic load flow by a multi-linear simulation algorithm[J].IEE Proceedings,1990,137(4):276-282.
  • 5SILVA M L D,RIBEIRO S M P,ARIENTI V L,et al.Probabilistic load flow techniques applied to power system expansion planning[J].IEEE Transactions.Power Systems,1990,5(4):1047-1053.
  • 6ZHANG P,LEE S T.Probabilistic load flow computation using the method of combined cumulants and Gram-Charlier expansion[J].IEEE Transactions on Power Systems,2004,19(1):676-682.
  • 7SU C L.Probabilistic load-flow computation using point estimate method[J].IEEE Transactions.Power Systems,2005,20(4):1843-1851.
  • 8MORALES J M,RUIZ J P.Point estimate schemes to solve the probabilistic power flow[J].IEEE Transactions on Power Systems,2007,22 (4):1594-1601.
  • 9李雪,李渝曾,李海英.几种概率潮流算法的比较与分析[J].电力系统及其自动化学报,2009,21(3):12-17. 被引量:18
  • 10丘文千.概率最优潮流方法及其在无功优化配置中的应用[J].浙江电力,2012,31(10):1-6. 被引量:3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部