基于遗传算法的网络计划多目标优化 被引量:1

Multi-objective Optimization of Network Planning Based on Genetic Algorithm
下载PDF
导出
摘要 工程项目网络计划是为了达到成本最低、工期最短、资源利用最均衡、质量最优并能够保证安全施工。文章从遗传算法基本原理出发,设计网络计划多目标优化的目标函数及约束条件,结果证明,该方法解决问题速度快,结果精确度高,对工程项目管理具有实际的应用价值。 Network planning aims to pursue the shortest duration, lowest cost, most balanced use of resources, the best quality and ensure the safety of construction and engineering risk information. According to the basic principles of genetic algorithm, this paper designs the function and constraints of the network planning multi-objective optimization, and the results show that the method is effective and of high precision. It has practical application value for project management.
作者 张艳妮
出处 《价值工程》 2014年第26期90-91,共2页 Value Engineering
关键词 网络计划 多目标优化 遗传算法 network planning multi-objective optimization genetic algorithm
  • 相关文献

参考文献3

二级参考文献16

  • 1李敏强.遗传算法的基本理论与应用[M].北京:科学出版社,2003..
  • 2玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 3Sou-Sen Leu, Chung-Huei Yang, Jiun-Ching Huang. Resource leveling in construction by genetic algorithm-based optimization and in decision support system spplicaiton[J]. Automation in Construction. 2000(10):27 ~ 41.
  • 4Weng-Tat Chan, David K. H. Chua, Govindan Kannan. Construction resource scheduling with genetic algorithms[J]. Journal of Construction Engineering and Management,1996(6):125 ~ 131.
  • 5Sou-Sen Leu, Chung-Huei Yang. GA-based multi-criteria optimal model for construction scheduling[J]. Journal of Construction Engineering and Managment, 1999(11):420 ~ 427.
  • 6Tarek Hegazy. Optimization of resource allocation and leveling using genetic algorithms[J]. Journal of Construction Engineering and Management, 1999(6):167 ~ 175.
  • 7Hegazy T,El-Zamzamy H. Project management software that meet the challenge[J].Cost Engineering Journal,1998, 4(5):25-33.
  • 8Johnson R. Resource constrained scheduling capabilities of commercial project management software[J]. Project Management Journal, 1992, 22(4):39-43.
  • 9Leu Sou-Sen, Yang Chung-Huei. GA-based multicriteria optimal model for construction scheduling[J].Journal of Construction Engineering and Management,1999,25(6):420-427.
  • 10Leu Sou-Sen, Yang Chung-Huei,Huang Jiun-Ching . Resource leveling in construction by genetic algorithm-based optimization and its decision support system application[J]. Automation in Construction, 2000 (10):27-41.

共引文献59

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部