废弃煤矿废弃物地下灌注技术可行性探讨 被引量:2

Feasibility of waste backfilling in abandoned coal mine
下载PDF
导出
摘要 为了降低废弃物及废弃煤矿对环境的污染,提出了废弃煤矿废弃物灌注技术的可行性。分析了可灌注废弃物的种类,讨论了目标地层的选择原则。提出采用可控充填、低压充填以及高压灌注等3阶段液力充填方法对废弃煤矿进行废弃物灌注。为保证工程顺利施工,需要检测灌注压力、压裂裂缝、地面隆起等情况,并控制灌注混合物的特性。初步分析表明,对废弃煤矿进行废弃物灌注具有技术可行性。 In order to reduce environmental risk, a possible and environmental technique to dispose the waste in abandoned coal mines is put forward. The types of injectable waste are analyzed. The principles for selection of target strata are discussed. Three hydraulic filling methods to inject waste in abandoned coal mine, i.e., controlled backfilling, low pressure backfilling filling and high pressure injection, are proposed. In order to achieve project performance, injection pressure, fracture propagation, surface uplift should be detected and the features of injected mixture should be controlled. The initial analysis indicates that it is technically feasible to dispose waste into abandoned coal mines.
作者 冀前辉
出处 《煤田地质与勘探》 CAS CSCD 北大核心 2014年第4期69-71,76,共4页 Coal Geology & Exploration
关键词 废弃煤矿 采空区塌陷 废弃物处置 液力回填 压裂 裂缝检测 abandoned coal mines gob subsidence waste disposal hydraulic backfilling fracturing detection of fracture
  • 相关文献

参考文献3

二级参考文献14

共引文献32

同被引文献25

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部