狮子洋隧道盾构地中对接技术及实施 被引量:16

Shield Docking Technologies for Shiziyang Tunnel
下载PDF
导出
摘要 对广深港客运专线狮子洋隧道盾构施工所采用的"相向掘进、地中对接、洞内解体"技术方案进行介绍,重点对"地中对接"技术及实施过程进行阐述和总结。通过加强"地中对接"实施过程控制和采取辅助措施,解决了对接精度要求高、对接面地层涌水量大及洞内拆机空间狭小等技术难题,从而达到精准、安全对接,实现了盾构在洞内安全拆机,取得了很好的效果。 In this article,the construction program of“opposite-direction boring,docking in ground,and dismantling in tunnel”used in Shiziyang shield-bored tunnel on Guangzhou-Shenzhen-Hong Kong passenger-dedicated railway is presented,with special attention paid to “docking in ground”.Difficulties,such as high docking precision,large water inflow at docking face,and small space for shield dismantling,have been conquered by strengthening the process control of“docking in ground”and by taking assistant countermeasures.In the end,the shield docking has been successfully completed,and good effect has been achieved.
作者 杜闯东
出处 《隧道建设》 2014年第8期771-777,共7页 Tunnel Construction
关键词 盾构隧道 相向掘进 地中对接 洞内解体 shield-bored tunnel opposite-direction boring docking in ground dismantling in tunnel
  • 相关文献

参考文献8

二级参考文献19

共引文献167

同被引文献179

引证文献16

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部