摘要
对于330 MW间接空冷供热汽轮机组甩负荷试验的组织、技术方面的措施进行了介绍,并对试验具备的条件、试验方法及步骤的重点工作进行了阐述。
The organizational and technical measures of the load rejecting test of 330 MW indirect air cooling Heating steam turbine unit were introduced, and the major works of the conditions, methods and procedures of the test were described.
出处
《能源与节能》
2014年第8期147-149,共3页
Energy and Energy Conservation
关键词
供热
汽轮机组
甩负荷
间接空冷
heating
steam turbine unit
load rejection
indirect air cooling