大渡河金川水电站土石围堰三维有限元渗流分析 被引量:2

Analysis on Seepage of Earthrock Cofferdam by 3D Finite Element,Jinchuan Hydropower Project
下载PDF
导出
摘要 金川水电站坝址区覆盖层深厚,两岸边坡卸荷发育,考虑运用三维渗流有限元理论及3D-seep软件,结合两岸岩体绕渗,对竖向防渗深度进行对比研究,并对围堰及防渗体的渗透参数进行了敏感性分析,最后给出推荐的围堰防渗方案。 The overburden in the dam site area of Jinchuan Hydropower Project is deep and thick.The unloading of both banks is devel-oped.By application of 3D seepage finite element theory and 3D-seep software as well as in combination of bypass seepage of the rock-mass of both banks, the vertical impervious depth is compared and studied.Meanwhile , the sensitivity analysis on the permeable parame-ters of the cofferdam and impervious body are performed.Finally, the impervious scheme foe the cofferdam is proposed.
出处 《西北水电》 2014年第4期54-58,共5页 Northwest Hydropower
关键词 土石围堰 三维渗流 稳定分析 防渗墙 金川水电站 earthrock cofferdam 3D seepage stability analysis cutoff wall Jinchuan Hydropower Project
  • 相关文献

参考文献3

  • 1朱伯芳.有限单元法原理及应用[M].2版.北京:水利电力出版社,1997.
  • 2谢定义,姚仰平,党发宁.高等土力学[M].北京:高等教育出版社,2007:46-48.
  • 3大渡河金川水电站工程围堰三维渗流计算专题研究报告[R].西安理工大学,2008.

共引文献12

同被引文献17

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部