Stability Study of a Mixed Islanded Power Network
Stability Study of a Mixed Islanded Power Network
摘要
This paper presents the modelling, simulation and analysis of the dynamic behaviour of a mixed power network of 2.78 GW including hydro, thermal and wind power plants. The modelling of each power plant is described. The set of parameters of the turbine speed governor of the hydroelectric power plant is determined with a specific identification procedure to achieve stable operation for different cases such as interconnected, isolated or islanded operation. The analysis of the stability of the entire mixed islanded power plant is investigated through time domain simulations for different sets of controllers parameters and for different disturbances (load rejection and turbulent wind speed profile).
参考文献19
-
1Working Group on Prime Mover and Energy Supply Models for System Dynamic Performance Studies. 1992. "Hydraulic Turbine and Control Models for System Dynamic Studies." IEEE Transactions on Power System 7 (1): 167-79.
-
2Kundur, P. 1994. Power System Stability and Control. Tata: McGraw-Hill Education Pvt Ltd..
-
3Trudnowski, D., and Agee, J. 1995. "Identifying a Hydraulic-Turbine Model from Measured Field Data." IEEE Transactions on Energy Conversion 10 (4): 768-72.
-
4Kawkabani, B., Pannatier, Y., and Simond, J. J. 2007."Modeling and Transient Simulation of UPFC (Unified Power Flow Controllers) in Power System Studies." In Proceedings of 2007 IEEE Lausanne Power Tech., 333-8.
-
5Padoan, Jr. A. C., Kawkabani, B., Schwery, A., Ramirez, C., Nicolet, C., Simond, J. J., and Avellan, F. 2010. "Dynamical Behavior Comparison between Variable Speed and Synchronous Machines with PSS." 1EEE Transactions on Power Systems 25 (3): 1555-65.
-
6Pannatier, Y., Kawkabani, B., Nicolet, C., Simond, J. J., Sehwery, A., and Allenbach, P. 2010. "Investigation of Control Strategies for Variable-Speed Pump-Turbine Units by Using a Simplified Model of the Converters." IEEE Transactions on Industrial Electronics 57 (9): 3O39-49.
-
7Nicolet, C., Greiveldinger, B., Herou, J., Kawkabani, B., Allenbach, P., Simond, J., and Avellan, F. 2007. "High-Order Modeling of Hydraulic Power Plant in Islanded Power Network." IEEE Transactions on Power Systems 22 (4): 1870-80.
-
8Nicolet, C. 2007. "Hydroacoustic Modelling and Numerical Simulation of Unsteady Operation of Hydroelectric Systems." Ph.D. thesis, Ecole Polytechnique Federale de Lausanne.
-
9Lalor, G., Mullane, A., and O'Malley, M. 2005. "Frequency Control and Wind Turbine Technologies." IEEE Transactions on Power Systems 20 (4): 1905-13.
-
10Hansen, L., Madsen, P., Blaabjerg, F., Christensen, H., Lindhard, U., and Eskildsen, K. 2001. "Generators and Power Electronics Technology for Wind Turbines." In Proceedings of the 27th Annual Conference of the 1EEE Industrial Electronics Society, 2000-5.
-
1于国文,韩进东.孤岛油生产裂解原料的研究[J].胜炼科技,1993(3):6-9.
-
2Power Control and Automation in NorthwestPower Network[J].Electricity,1997(1):5-6.
-
3Pedro Camilo de Oliveira e Silva,Basile Kawkabani,Sébastien Alligné,Christophe Nicolet,Jean-Jacques Simond,Francois Avellan.Stability Study on Hydroelectric Production Site Using Eigenvalues Analysis Method[J].Journal of Energy and Power Engineering,2012,6(6):940-948.
-
4张启平,王承民,侯志俭.Power Network Parameter Estimation Method Based on Data Mining Technology[J].Journal of Shanghai Jiaotong university(Science),2008,13(4):468-472.
-
5Nicolas Junod,Philippe Allenbach,Sylvain Robert,Andre Hodder,Gyorgy Banyai,Basile Kawkabani.HIL Simulation of a Mixed Islanded Power Network with External DSP Regulator[J].Journal of Energy and Power Engineering,2012,6(7):1106-1113.
-
6Svetlana Berjozkina,Antans Sauhats,Edvins Vanzovichs.Simulations of the Allowable Load Current of the Overhead Lines in the Latvian Power Network[J].Journal of Energy and Power Engineering,2012,6(9):1521-1526.
-
7Wang Xiliang(China Electric Power Information Center).The Three Gorges Power Project Will PromotePower Network Interconnections throughout China[J].Electricity,1998(3):6-8.
-
8Li Zhi(Scientific & Technical Department of NEPGC).Current State of Simulation Technique Application in Northeast Power Network[J].Electricity,1997(2):19-22.
-
9Interconnection Project of Fujian Power Grid With East China Power Network Formally Started to Construct[J].Electricity,2000(2):55-55.
-
10电力动态[J].中国电力,2013,46(3):52-52.