水厂处理构筑物组(叠)合及连接设计 被引量:6

Design of Combination and Connection of Structures in Water Treatment Plants
原文传递
导出
摘要 面对不容乐观的江河水源水质现状,净水厂处理工艺除常规处理外,还需考虑预处理及深度处理,或者在厂平面中预留场地,因此平面布置中处理构筑物单元众多,各单元间相互连接的各类管线繁复。在工艺流程顺畅、管理维护方便的条件下,对处理构筑物和辅助建筑物进行合理的组(叠)合布置,可以有效节省宝贵的土地资源,使得处理构筑物布置集中,功能分明且环境协调优美。为此,介绍了处理构筑物组(叠)合设计以及构筑物间连接设计方法,可供参考。 Due to the deteriorating quality of raw water from rivers in China, pre-treatment and ad- vanced treatment or land reservation in water treatment plants using only conventional processes should be considered. Therefore, layout of treatment structures and connection of various pipes become much more complicated. Under the condition of suitable process flow and convenience of management and maintenance, the reasonable combination of structures could save the precious land resources, get structures together, clarify the functions and decorate the environment. Thus, the design of combination and connection of structures were introduced for reference.
作者 叶新
出处 《中国给水排水》 CAS CSCD 北大核心 2014年第18期36-39,共4页 China Water & Wastewater
关键词 预处理 常规处理 深度处理 工艺流程 构筑物组(叠)合布置 pre-treatment conventional treatment advanced treatment process flow combined layout of structures
  • 相关文献

参考文献2

二级参考文献4

共引文献8

同被引文献17

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部