期刊文献+

下游支流顶托影响下的银江水电站坝址处水位流量关系 被引量:10

Stage-discharge Relationship at Yinjiang Hydropower Dam Affected by Downstream Tributary Backwater
原文传递
导出
摘要 针对水利水电工程规划和设计中受下游支流顶托影响的复杂条件下水位流量关系的拟定和使用困难问题,以金沙江干流银江水电站为例,采用统计分析法揭示了金沙江干流与支流雅砻江洪水组成及遭遇情况,采用典型年洪水组成法研究了设计洪水组成,采用实测资料与一维恒定流模型相结合的方法研究了受下游支流雅砻江顶托影响的银江水电站坝址处的复杂水位流量关系。结果表明,银江水电站坝址水位流量关系成果精度满足设计要求,可作为工程设计依据。 The determination of stage-discharge relationship under complicated conditions such as atiectect by the downstream tributary backwater is difficult during hydraulic engineering planning and design. Yinjiang hydropower project on the Jinsha River is chosen as a research object in this article. The flood composition and encounter situations between Jinshajiang River and Yalongjiang River was revealed by using statistical analysis method. Design flood composition was studied by using typicol years flood composition method. Complicated stage-discharge relationship at dam site was studied by using the method of observed data with the one-dimensional steady flow model combined. The research had provided a reasonable and reliable rating-curve for engineering design.
出处 《水电能源科学》 北大核心 2014年第8期43-47,共5页 Water Resources and Power
关键词 水位流量关系 顶托影响 洪水组成及遭遇 河道一维恒定流模型 stage-discharge relation backwater effect flood composition and encounter river one-dimensional steady flow model
  • 相关文献

参考文献2

二级参考文献4

  • 1北京市规划委员会.北京市城市总体规划(2004~2020年)[M]北京:北京市规划委员会,2003.
  • 2Hydrologic Engineering Center. HEC-RAS User'sManual Version 4.0[M].Davis,CA:US Army Corps of Engineers,2008.
  • 3韦明杰;王军;胡淑彦.南沙河综合整治规划(2008~2020年)[M]北京:北京市城市规划设计研究院,2008.
  • 4黄启有,谷洪钦,华家鹏,张琨.应用推理公式推求不同形状小流域设计流量[J].水电能源科学,2010,28(1):22-24. 被引量:13

共引文献16

同被引文献92

引证文献10

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部