摘要
介绍了研究人工湿地的工程概况及相关参数,对几种指标去除率及运行中存在的不足进行了分析,探讨了潜流人工湿地在北方污水深度处理的可行性。
This article introduces the general project profile and related parameters of the studied constructed wetlands. Through the analysis of several indicators' removal rate and deficiencies in the operation, this article explores the feasibility of applying subsurface flow constructed wetland in northern wastewater advanced treatment.
出处
《绿色科技》
2014年第9期177-179,共3页
Journal of Green Science and Technology
关键词
潜流人工湿地
污水深度处理
去除率
研究
subsurface flow constructed wetland
advanced wastewater treatment, removal rate
deficiency
research