某水库水位变动期坝坡稳定分析 被引量:1

Dam Slope Stability Analysis with Fluctuation of Water Table of A Reservoir
下载PDF
导出
摘要 某水库作为北江引水工程的备用水源,由于其运行调度的变化,需要对该水库在应急取水和蓄水回补过程中坝体稳定状况进行分析。该文以理正岩土5.5与stab2009为计算软件,重点研究水位骤降与水位升高过程中该水库上、下游坡的稳定,同时对于处于不稳定状态的坝坡提出切实可行的加固方案。 As an alternate source of Beijiang water diversion project , due to the change on operation , the dam slope stability of res-ervoir need to be analyzed in the process of emergency water intaking and impoundment .In this paper , by using of LIZHENG 5.5 and STAB2009, the research is emphasized on slope stability of upstream and downstream of the reservoir in the process of rapid drawdown and raise of water level .At the same time , feasible reinforcement scheme is put forward for the dam slope in the unsteady state.
作者 林心 张敏
出处 《广东水利水电》 2014年第8期16-20,共5页 Guangdong Water Resources and Hydropower
关键词 水位变动 渗流稳定 坝坡稳定 fluctuation of water table seepage stability dam slope stability
  • 相关文献

参考文献7

  • 1SL252-2000.水利水电工程等级划分及洪水标准[S].[S].,..
  • 2广州北江引水工程(水源工程部分)项目建议书[R].
  • 3广州北江引水工程(花都水厂及配水管道工程部分)花都水厂应急备用取水泵房建设方案论证报告[R].
  • 4某水库加固项目工程地质勘察报告[R].
  • 5SL274-2001.碾压式土石坝设计规范[S].[S].,..
  • 6DL/T5395-2007,碾压式土石坝设计规范[S].
  • 7水工建筑物[M].北京:中国水利水电出版社,2003.

共引文献439

同被引文献7

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部