摘要
随着BIM的逐步发展,传统的图形工作站的运行模式已无法满足设计企业对图形处理性能、成本和数据储存安全的需求。针对这一现状,笔者根据所在单位的实际需求,开展了虚拟化应用的实践。通过整合硬件资源,协调用户错峰应用实现了较高的利用率和较低的TCO成本。
With the development of the BIM application technology, it is becoming increasingly difficult for the traditional graphic workstation to keep abreast with users' need for a better performance, lower cost and safer data storage. To tackle the problem, the author has carried out the practice on virtualized GPUs based on the specific need of the institute he works in, and managed to achieve a better utilization with lower TCO cost through hardware integration and peak shifting management.
出处
《自动化与仪器仪表》
2014年第6期147-150,共4页
Automation & Instrumentation