摘要 针对露天矿生产计划优化中使用锥体排除法产生地质最优开采体序列时,不考虑锥体之间重叠部分对相应锥体的平均品位影响的问题,提出了改进的锥体排除算法.该算法在锥体排除过程中,重新确定了锥体的空间搜索逻辑,同时重新计算锥体数组中受品位最低锥体影响的各锥体的平均品位并重新排序.把新算法产生的地质最优开采体序列作为状态变量建立动态排序模型,对所有可行的路径进行评价,得出NPV最大的路径作为最优开采方案.实例应用表明,在相同技术经济条件下,改进后的优化算法无论是生产能力稳定性还是最终净现值都明显优于原算法,其中NPV提高了10.5%. In optimizing production scheduling of open-pit mine, the effect of overlap among cones on its average grade was usually ignored, in oder to deal with this shortcoming, an improved cone elimination algorithm was proposed. In the process of cone elimination, the spatial search logic was redefined, the average grade of cones influenced by the lowest grade cone and rearranged cones in the cone array were recalculated. A dynamic sequence model was established by taking the geological optimum push-backs generated by new algorithm as state variable, all feasible paths were evaluated, and the path whose NPV is the biggest was taken as the optimal exploitation scheme. The application example showed that under the same conditions of technology and economy, the improved algorithm is superior to the initial algorithm in the production stability and NPV, where the NPV increases by 10.5%.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2014年第10期1492-1496,共5页 Journal of Northeastern University(Natural Science)
基金 辽宁省自然科学基金资助项目(201102065 201202075) 教育部新世纪人才支持计划项目(NCET-11-0073) 教育部博士点专项科研基金资助项目(20130042110012) 东北大学研究生科研创新项目(N130601002) 中央高校基本科研业务费专项资金资助项目(N120101001) 格平绿色助学行动辽宁环境科研‘123’工程资助项目(CEPF 2012-123-1-3)
关键词 露天矿 生产规划 优化 锥体排除法 动态规划 open-pit mine production scheduling optimization cone elimination dynamicplanning
  • 相关文献

参考文献10

  • 1Crawford J T,Davey R K.Case study in openpit limit analysis[C]//Computer Methods for the 80s in the Mineral Industry.New York,1979:311-318.
  • 2Belobraidich W.Computer assisted long range mine planning practice at ray mine division—Kennecott copper corporation[C]//Computer Methods for the 80’s in the Mineral Industry.New York,1979:349-357.
  • 3Savage C J,Preller A H.Computerized mine planning system at Rio Tinto Mineral,S.A.(Spain)[C]//Proceedings of the 19th Application of Computers and Operations Research in the Mineral Industry.Universal Park,1987:441-456.
  • 4Halatchev R A.A model of discounted profit variation of open pit production sequencing optimization[C]//Proceedings of the 32nd International Symposium on the Application of Computers and Operations Research in the Mineral Industry.Tucson,2005:315-323.
  • 5Ramazan S.The new fundamental tree algorithm for production scheduling of open pit mines[J].European Journal of Operations Research,2006,177(2):1153-1166.
  • 6Armstrong M,Galli A.A new approach to flexible open pit optimization and scheduling[C]//Proceedings of the 35th International Symposium of Application of Computers and Operations Research in the Minerals Industry.Wollongong,2011:253-263.
  • 7Menabde M,Froyland G,Stone P.Mining schedule optimization for conditionally simulated orebodies[C]//Proceedings of the International Symposium on Orebody Modeling and Strategic Mine Planning:Uncertainty and Risk Management.Perth,2004:379-383.
  • 8Armstrong M,Galli A,Ndiaye A A.A case study on the impact of hedging against foreign exchange risk and energy price risk[C]//Proceedings of Orebody Modeling and Strategic Mine Planning.Dimitrakopoulos,2009:95-99.
  • 9Gholamnejad J,Osanloo M.Incorporation of ore grade uncertainty into the push back design process[J].The Journal of the Southern African Institute of Mining and Metallurgy,2007,107:177-185.
  • 10Grobler F,Elkington T,Rendu J M.Robust decision makingapplication to mine planning under price uncertainty[C]//Proceedings of the 35th International Symposium of Application of Computers and Operations Research in the Minerals Industry.Wollongong,2011:59-66.