摘要 针对大断面高速铁路隧道施工过程中出现的复杂施工力学问题,以花甲山高速铁路隧道为依托工程,采用三维数值软件对花甲山隧道的施工动态过程进行数值模拟,得到了隧道围岩的应力、位移分布特征和地表变形规律,通过与现场实测数据进行对比,总结出大断面高速铁路隧道的动态施工力学特征,为大断面高速铁路隧道施工方案优化提供依据. As the construction mechanics characteristics of large cross section high speed railway tunnel is complex, the dynamic construction process of Hua jia shan tunnel is simulated by using three-dimensional numerical software. The stress and displacement characteristics of rock mass and surface deformation law are obtained. By comparing with field measured data, the dynamic construction mechanical characteristics of large cross section high speed railway tunnel are concluded which provides support for construction scheme optimization of this project.
作者 黄阜 何瀚
出处 《湖南理工学院学报(自然科学版)》 CAS 2014年第3期70-75,共6页 Journal of Hunan Institute of Science and Technology(Natural Sciences)
基金 国家自然科学基金青年科学基金(51308072) 长沙理工大学桥梁工程安全控制省部共建教育部重点实验室开放基金(13KC04)
关键词 大断面铁路隧道 数值模拟 监控量测 力学特征 施工方法 large cross section railway tunnel numerical simulation monitoring measurement mechanical characteristics,construction method
  • 相关文献

参考文献8

二级参考文献41

共引文献100

同被引文献17

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部