摘要
本文通过对神朔铁路开行不同编组类型万吨组合列车、不同机型牵引万吨组合列车以及万吨组合列车通过不同分相处所产生的列车纵向冲动各个环节进行分析研究,总结制定出了适合神朔铁路万吨组合列车运行和现有司乘人员条件下的平稳操纵方法和具体措施。
In this paper, by Analysis the ten thousand tons combined train of different marshalling types, the ten thousand tons combined train of traction models as well as all aspects of train longitudinal vibration of ten thousand tons combined train through different phase, summarizes the smooth manipulation methods and specific measures of ten thousand tons combination train and existing passengers suitabling Shenshuo Railway.
出处
《科技与企业》
2014年第20期193-195,共3页
Science-Technology Enterprise
关键词
万吨组合列车
坡道
无线重联设备
分相
操纵
措施
Ten thousand tons combined train
Ramp
Devices of wireless reconnection
Phase
Manipulate
measures