基于SD的资源约束型工程项目群进度管理研究 被引量:1

Schedule Management of Resource-constrained Construction Project Group Based on System Dynamics
下载PDF
导出
摘要 面对激烈的市场竞争,建筑工程项目逐渐以大型、复杂和群组的形态出现,企业需要同时建设多个项目,但由于不同子项目会在关键资源的利用上存在各种关联与冲突,导致资源约束条件下的进度安排较为复杂。结合建设工程项目群进度管理理论和系统动力学方法,通过CCPM对项目群进行资源配置,基于系统动力学建立项目群SD模型;并利用情景分析将外界扰动因子纳入到模型中,进而对其进度进行模拟仿真;最终得出总体的资源配置和进度计划的设计方案,对资源约束条件下的项目群进度管理有一定的借鉴意义。 Faced with the fierce market competition, construction projects become larger, more complex and appear in groups. Companies need to build multiple projects simultaneously. However, different subprojects will conflict with each other in the use of key resources, resulting in resource-constrained schedule more complex. Combined the schedule management theories of construction project group and the method of system dynamics, this article allocates the resources through CCPM and establishes the system dynamics models of the project group, then uses the scenario analysis to put the external perturbation factors into the model and simulate its progress, finally designs the plan of the overall resource allocation and scheduling. It has some significance for managing the schedule of resource-constrained project group.
出处 《陕西电力》 2014年第9期73-78,共6页 Shanxi Electric Power
基金 国家自然科学基金资助项目(71271082) 中央高校基本科研业务费专项资金资助(2014XS58)
关键词 建设工程项目群 资源约束 进度管理 系统动力学 construction project group resource constraint schedule management system dynamics
  • 相关文献

参考文献32

  • 1PRITSKER A,WATERS L,WOLFE P. Muhi-project Sche- duling with Limited Resources: a Zero-one Programming Approach[J]. Management Science, 1969, 16 ( 1 ) :93-108.
  • 2MOHANTHY R P,SIDDIQ M K. Multiple Projects Multiple Resources-constrained Scheduling: Some Studies[J]. Inter- national Journal of Production Research, 1989,27 ( 2 ) : 261-280.
  • 3DREXL A. Scheduling of Project Networks by Job Assign- ment[J]. Management Science, 1991, (30):1590-1602.
  • 4DECKRO R F,WINKOFSKY E P,HEBERT J E,et al. A Decomposition Approach to Multi-project Scheduling[J]. European Journal of Operational Research, 199 1, 51 ( 1 ): 110-118.
  • 5VERCELLIS C. Constrained Multi-Project Planning Pro- blems:a Lagrangean Decomposition Approach[J]. European Journal of Operational Research, 1994,78(2):267-275.
  • 6STEYN H. An Investigation into the Fundamentals of Critical Chain Project Scheduling[J], International Journal of Project Management,2000,19(6):363-369.
  • 7HERROELEN W, LEUS R. On the Merits and Pitfalls of Critical Chain Scheduling[J]. Journal of Operations Mana- gement, 2001,19 (5) :559-577.
  • 8WEI C C,LIU P H,TSAI Y C. Resource-constrained Project Management Using Enhanced Theory of Con- straint [J]. International Journal of Project Management, 2002,20 (7) :561-567.
  • 9JONES D, MILLER A, SRINIVASAN M. Applying Theory of Constrains Principles and Lean Thinking at the Marine Corps Maintenance Center[J]. Defense AR Journal,2004, 11 (2) : 134-135.
  • 10KURTULUS I S, DAVIS E W. Multi-project Scheduling: Categorization of Heuristic Rules Performance[J]. Manage- ment Science, 1982,28(2):161-172.

二级参考文献105

共引文献278

同被引文献9

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部