摘要
天津宝龙城市广场原设计为超高层城市综合体项目,建设过程中1#塔楼修改为广电办公大楼,部分裙房区域修改为演播大厅。介绍了水消防修改设计过程中,在比较原有消防系统和改造后的消防系统基础上,如何利用、改造原消防设施来满足修改后的消防要求,节能同时保证安全。
The original design of Baolong city plaza in Tianjin was a super high-rising compre- hensive building. During the construction, the No. 1 tower was changed as radio and television office building and partial skirt building was changed as studio lobby. This paper introduced based on former and modified fire prevention systems, how to utilize and modify the former fire prevention fa- cilities to meet the fire prevention requirements of the modified project during the modifying process of hydraulic fire prevention system. The energy saving and safety were secured at the same time.
出处
《给水排水》
CSCD
北大核心
2014年第11期53-57,共5页
Water & Wastewater Engineering
关键词
超高层建筑
消防改造
雨淋系统
消防水池
泵房
Super high-rising building
Fire prevention system modification
Spraying extinguishing system
Fire prevention water tank
Pump station