期刊文献+

再制造曲轴径向跳动不确定性的内涵与测度 被引量:2

Connotation and Measurement of the Uncertainty of Radial Runout of Remanufactured Crankshaft
下载PDF
导出
摘要 再制造曲轴径向跳动不确定性是影响再制造发动机质量稳定性和服役安全性的关键因素之一。从回收废旧曲轴失效形式不同、再制造修复工艺各异导致径向跳动存在差异的角度,分析再制造曲轴径向跳动不确定性的内涵;根据径向跳动不确定性产生的原因将其归结为随机不确定性和模糊不确定性;应用'随机熵'测度径向跳动的随机不确定性,运用'模糊熵'测度径向跳动的模糊不确定性,建立基于积空间P×M的复合熵模型,定量化描述曲轴径向跳动的整体不确定度;以某重型发动机再制造企业WD615系列68型曲轴再制造为例,对测度方法进行实例验证,结果证明了方法的有效性和实用性,研究内容为再制造不确定优化决策提供了理论依据。 The uncertainty of radial runout of remanufactured crankshaft is a key factor affecting the quality and the safety of the remanufactured engine. First, the connotation of radial runout's uncertainty of the remanufactured crankshaft journal is analyzed, based on the failure mode of the recycled scrap crankshafts and the diversity of the uncertainty of radial runout which is caused by different remanufacturing repair technology. The uncertainty of the radial runout is classified into random uncertainty and fuzzy uncertainty based on the reasons of the uncertainty of radial runout. Then, "random entropy" is used to measure the random uncertainty and "fuzzy entropy" is applied to measure the fuzzy uncertainty of radial runout respectively. A composite entropy model based on product space P×M is built to quantitatively describe the overall uncertainty of radial runout of crankshaft. Last, the verification of the measure methods is carried out with the WD615 series 68 crankshaft remanufacturing of a heavy duty engine remanufacturing enterprise as example, it is shown that the methods are effective and feasible. This research provides a theoretical basis for the decision-making of remanufacturing uncertainty optimization.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2014年第19期144-150,共7页 Journal of Mechanical Engineering
基金 国家重点基础研究发展计划(973计划 2011CB013406) 教育部人文社会科学研究青年基金(12YJC630111) 安徽省自然科学基金(1308085MG109)资助项目
关键词 再制造 不确定性 径向跳动 remanufacturing uncertainty runout
  • 相关文献

参考文献17

  • 1SUTHERLAND J W, ADLER D P, HAAPALA K R, et al. A comparison of manufacturing and remanufacturing energy intensities with application to diesel engine production[J]. CIRP Annals-Manufacturing Technology, 2008, 57(I): 5-8.
  • 2徐滨士.中国再制造工程及其进展[J].中国表面工程,2010,23(2):1-6. 被引量:112
  • 3徐滨士,董世运,朱胜,史佩京.再制造成形技术发展及展望[J].机械工程学报,2012,48(15):96-105. 被引量:117
  • 4WESTKAMPER E, ARNDT G. Life cycle management and assessment : Approaches and visions towardssustainable manufacturing[J]. CIRP Annals-Manufacturing Technology, 2000, 49(2): 501-526.
  • 5GALBRETH M R, BLACKBURN J D. Optimal acquisition quantities in remanufacturing with condition uncertainty[J]. Production and Operations Management, 2010, 19(1): 61-69.
  • 6KETZENBERG M, LAAN V D, TEUNTER R H. Value of information in closed loop supply chains[J]. Production & Operations Management, 2006, 15(3): 393-406.
  • 7KETZENBERG M. The value of information in a capacitated closed loop supply chain[J]. European Journal ofOperationalResearch, 2009, 198(2): 491-503.
  • 8JIN Xiaoning, NI Jun, KOREN Y. Optimal control of reassembly with variable quality returns in a product remanufac~ing system[J]. Manufacturing Technology, 2011, 60(1): 25-28.
  • 9苏春,沙洋娟.基于混合不确定性和证据理论的再制造生产计划[J].东南大学学报(自然科学版),2010,40(4):712-716. 被引量:10
  • 10李聪波,刘飞,易茜,李成川.基于关键链的再制造系统不确定性生产调度方法[J].机械工程学报,2011,47(15):121-126. 被引量:10

二级参考文献71

共引文献275

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部