摘要
In this paper,it presents the results of calculation of solidification process of copper continuous cast bar by cross section size 120 mm × 70 mm with application of Pro Cast 2010 software. The estimation of mould design effect on solidification process of continuos copper cast bar is completed at various speeds of casting.Profiles of liquid metal cavities and temperature allocations in the cast bar at various casting speeds are defined.The analysis of received liquid metal cavity profiles shows that a new mold construction allows significantly decrease of the length of the liquid metal cavity during continuous copper casting at HAZELETTcasting machine and the increase of maximum casting speed from 10 to 11 m / min. Adequacy of the results of copper continuous cast bar solidification process calculation is confirmed by the experimental data.
In this paper, it presents the results of calculation of solidification process of copper continuous cast bar by cross section size 120 mmx70 mm with application of ProCast 2010 software. The estimation of mould design effect on solidification process of continuos copper cast bar is completed at various speeds of casting. Profiles of liquid metal cavities and temperature allocations in the cast bar at various casting speeds are defined. The analysis of received liquid metal cavity profiles shows that a new mold construction allows significantly decrease of the length of the liquid metal cavity during continuous copper casting at HAZELET casting machine and the increase of maximum casting speed from 10 to Ii m/min. Adequacy of the results of copper continuous cast bar solidification process calculation is confirmed by the experimental data.