期刊文献+

分期开采方法在宝明油页岩露天矿的应用 被引量:3

Application of phased mining method in Baoming oil shale open-pit mine
下载PDF
导出
摘要 分析了宝明油页岩露天矿的特点,确定了一采区的合理开采境界,利用大型数字化矿山设计软件minex建立了三维矿床地质模型,并对分期开采时各分期的剥、采时空关系进行模拟,计算了各分期的矿岩量及剥采比,对分期计算结果的均衡方案进行了优化比选,确定了最终的分期开采计划。 The article analyzes the characteristics of Baoming oil shale open-pit mine and determines reasonable mining boundary of a mining area. Using large digital mine design software minex, the mine establishes three dimensional model of mineral deposits,and simulates stripping, mining space-time relationship of each stage in stage mining. The article calculates ore quantity and stripping ratio of each stage, compares and selects equalization scheme of staging calculation results, and determines the final staging mining plan.
出处 《露天采矿技术》 CAS 2014年第11期22-25,共4页 Opencast Mining Technology
关键词 分期开采 露天矿 优化 开采程序 油页岩 staging mining open-pit mine optimization mining procedure oil shale
  • 相关文献

参考文献4

二级参考文献4

共引文献43

同被引文献15

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部