导出
摘要 集装箱船舶大型化的趋势下,在集装箱码头混合装卸方法的基础上提出了基于堆垛的混合装卸优化方法,并且将一组甲板对应的多贝位集装箱分解为多个单贝位集装箱装卸研究方法模型求解。以最小化单一贝位集装箱装卸的完成时间为目标,建立单贝位数学模型,使用遗传算法求解单贝位的最小完成时间,再根据其和求得一组甲板上、下集装箱装卸的完成时间,并拓展到多组甲板情况。通过数值计算,与传统装卸方法对比分析,验证了模型和算法的可行性和有效性,为大型集装箱船舶装卸方法的优化提供了依据。 With container ship' s large-scale, mixed loading and discharging method based on stacks is proposed and a set of deck is decomposed into multiple single bays in a container terminal. The mathematical model of a single bay is set up in the target of minimizing completion time of a single bay, and expanding the minimum completion time of the single bay calculated by a genetic algorithm to the multiple bays. Through numerical calculation and the comparison with traditional handling methods, the feasibility and effectiveness of the model and algorithm is proved in order to provide a basis for the large-scale container ship handling method of optimization.
出处 《科技与管理》 2014年第6期52-56,66,共6页 Science-Technology and Management
基金 国家软科学基金项目(2013GXS2D025) 浙江省海洋文化与经济研究中心项目(11HYJDYY04)
关键词 集装箱码头 混合装卸 堆垛 遗传算法 container terminals mixed loading and discharging method stacks genetic algorithm
  • 相关文献

参考文献13

  • 1CRAINIC T G,KIM K H.Intermodal transportation,hand booksin operations research and management science[M].The Nether-lands:Amsterdam,2007:501-519.
  • 2DAGANZO C F.The crane scheduling problem[J].Transporta-tion Research B,1989,23(3):159-175.
  • 3PETERKOFSKY R I,DAGANZO C F.A branch and bound solu-tion method for the crane scheduling problem[J].TransportationResearch B,1990,24(3):159-172.
  • 4BISH E K.A multiple-crane-constrained scheduling problem in acontainer terminal[J].European Journal of Operational Research,2003,144(1):83-107.
  • 5KIM K H,PARK Y M.A crane scheduling method for port con-tainer terminals[J].European Journal of Operational Research,2004,156(3):752-786.
  • 6LEE D H,WANG H Q,MIAO L.Quay crane scheduling with non-interference constraints in port container terminals[J].Transporta-tion Research Part E,2008,44:124-135.
  • 7韩笑乐,梁亮,陆志强,奚立峰.集装箱码头岸吊作业调度建模及调度策略研究[J].工业工程与管理,2009,14(5):20-26. 被引量:12
  • 8李晨,陆志强,陈璐.具有岸桥碰撞和甲板约束的岸桥混合装卸作业调度优化[J].上海交通大学学报,2010,44(8):1159-1164. 被引量:9
  • 9ZHU Y,LIM A.Crane scheduling with non-crossing constraint[J].Journal of the Operational Research Society,2005,57(12):1464-1471.
  • 10LIU J,WAN Y W,WANG L.Quay crane scheduling at containerterminals to minimize the maximum relative tardiness of vessel de-partures[J].Naval Research Logistics,2006,53(1):60-74.

二级参考文献15

  • 1杜麒栋.中国集装箱港口发展巡礼[J].中国港口,2008(1):8-11. 被引量:1
  • 2曾庆成,高宇.集装箱码头装卸桥调度优化模型与算法[J].计算机工程与应用,2006,42(32):217-219. 被引量:16
  • 3中国国际货运代理协会.国际海上货运代理理论与实务[M].北京:中国对外经济贸易出版社,2004.
  • 4Vis I F A, de Koster R. Transshipment of containers at a container terminal: An overview [J]. European Journal of Operational Research, 2003,147 (1) : 1-16.
  • 5Bisb E K. A multiple-crane-constrained scheduling problem in a container terminal[ J ]. European Journal of Operational Research, 2003,144( 1 ) : 83-107.
  • 6Kim K H, Park Y M. A crane scheduling method for port container terminals [J]. European Journal of Operational Research, 2004,156 (2) : 752-768.
  • 7Lee D H,Wang H Q, Miao L X. Quay crane scheduling with non-interference constraints in port container terminals [J]. Transportation Research Part E, 2008,44 ( 1 ) : 124-135.
  • 8Daganzo C F. The crane scheduling problem [J]. Transportation Research Part B, 1989, 23: 159-175.
  • 9Peterkofsky R I, Daganzo C F. A branch and bound solution method for the crane scheduling problem [J]. Transportation Research Part B, 1990, 24: 159- 172.
  • 10Lim A, Rodrigues B, Xiao F, et al. Crane scheduling with spatial constraints[J]. Naval Research Logistics, 2004, 51: 386-406.

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部